Preconstruction Design Services for Sprinkler Upgrade to Industria Building
BE FIRST (REGENERATION) LTD.
Development of design of sprinkler upgrade works to Industria Building in Barking. This work is required to bring the sprinkler system in line with HHS requirements and to allow storage of goods at height. Design indicative guidance has been supplied within the tender documentation, alongside an indicative programme, and pricing schedule.
£2.2m - 2.7mBarking17 Mar 2026Open tender →